Power your campus before the grid arrives.
Bridge-to-grid power for data centers: 25 MW ISO per unit, behind the meter, producing within 7 days once the site is ready and the equipment is on site.

The challenge
The building is ready. The grid is not.
New grid connections can take years, while halls, cooling and IT load are ready far sooner. Every month without power is a month without revenue.
How Angie Energy solves it
01
Speed to power
Producing within 7 days once the site is ready and the equipment is on site.
02
Bridge to grid
Run on our units until your utility connection is live.
03
Scale with your load
25 MW ISO per unit. Add units as your IT load grows.
04
Redundancy
Install more units than you need, so one can be serviced while the others carry the load.
05
Behind the meter
Your own power plant on your site, independent of grid constraints.
06
Plug and play
Two trailers, no foundation, no concrete pad. Position, connect, power on.
The figure that matters
25MWISO1
Per unit. Add units to scale.
1 ISO rating. Output varies with frequency, ambient temperature and pressure.

Lease or PPA
Your terms.
Flexible terms for temporary or permanent power.
- Lease
- Bridging power until your grid connection is live, on flexible terms.
- PPA
- A full range of services, including fuel sourcing, management and guaranteed kW output. Temporary or permanent power.
How much power do you need, and where?
Tell us about your site. We’ll tell you how fast we can power it.


