
Plug-and-play gas turbine power
Power in 7 days.
25 MW ISO per unit, producing within 7 days once your site is ready and the equipment is on site. Add units to scale. Lease or PPA.
The problem
The grid can’t deliver power fast enough.
New grid connections can take years. Data centers and AI, growing cities and heavy industry need power now. Install your own behind-the-meter power plant.
The solution
Plug and play.
Each unit is a 25 MW ISO aeroderivative gas turbine package on two trailers. No foundation, no concrete pad: position the trailers, connect fuel and cables, power on. Add units as your load grows.

25MWISO1
Per unit. Add units to scale.
7days
To power, once the site is ready and the equipment is on site.
50 / 60Hz
Built for 50 Hz and 60 Hz grids.
Dualfuel
Natural gas or liquid fuel.
0foundations
No concrete pad. Minimal site preparation.
2trailers
Generator on one. Controls on the other.
1 ISO rating. Output varies with frequency, ambient temperature and pressure.
Who we power
For projects that can’t wait.

Data centers
Power your campus before the grid arrives.

Governments & utilities
Fast relief when the grid falls short.

Industry & mining
Reliable power where there is no grid.
How it works
Ready site to power in 7 days.
01
Site ready
A level, compacted pad, a fuel supply and a connection point. No foundation or concrete pad.
02
Deploy
Two trailers arrive, are positioned, and fuel and cables are connected.
03
Power on
25 MW ISO per unit. Add units as demand grows.
Lease or PPA
Your terms.
Flexible terms for temporary or permanent power.
- Lease
- Bridging power until your grid connection is live, on flexible terms.
- PPA
- A full range of services, including fuel sourcing, management and guaranteed kW output. Temporary or permanent power.
How much power do you need, and where?
Tell us about your site. We’ll tell you how fast we can power it.
