Power in 7 days.
25 MW ISO per unit, producing within 7 days once your site is ready and the equipment is on site. Add units to scale. Lease or PPA.
- Unit running
- Power on the line
- Data center live
Key figures
- Per unit. Add units to scale.
- 25MW ISO1
- To power, once the site is ready and the equipment is on site.
- 7days
- Built for 50 Hz and 60 Hz grids.
- 50 / 60Hz
- Natural gas or liquid fuel.
- Dualfuel
- No concrete pad. Minimal site preparation.
- 0foundations
- Generator on one. Controls on the other.
- 2trailers
1 ISO rating. Output varies with frequency, ambient temperature and pressure.
The grid can’t deliver power fast enough.
New grid connections can take years. Data centers and AI, growing cities and heavy industry need power now. Install your own behind-the-meter power plant.

Plug and play.
Each unit is a 25 MW ISO aeroderivative gas turbine package on two trailers. No foundation, no concrete pad: position the trailers, connect fuel and cables, power on. Add units as your load grows.
What the site needs
- A level, compacted pad
- A fuel supply: natural gas or liquid fuel
- A connection point
What arrives
- Two road-legal trailers: power and control
- Positioning, fuel and cable connection
- Power within 7 days, once the site is ready and the equipment is on site
Lease or PPA
Flexible terms for temporary or permanent power.
- Lease
- Bridging power until your grid connection is live, on flexible terms.
- PPA
- A full range of services, including fuel sourcing, management and guaranteed kW output. Temporary or permanent power.
How much power do you need, and where?
Tell us about your site. We’ll tell you how fast we can power it.